Livoa LogoLivoa
GPS
DC Power
Ant 1
Ant 0
Backhaul/Net
NBIoT/4G
Ant 0 – Connect the 1 or 5 m RF Coax cable and then connect to the OMNI antenna.
GPS – Connect the shorter RF Coax cable and connect to GPS antenna. This should be mounted on the structure with a clear view of the sky.
Ethernet – Cat 6, weather protected cable should run from the gateway to the comms enclosure. Connect to the POE port of the brick. POE should be plugged into power and the ethernet connection connected to Eth 2 on the Digi. (Important for internet connectivity)
Cellular – Short OMNI antenna should be screwed into the bottom of the gateway.
Grounding – Should be grounded to the structure.
DC & Ant 1 – Unused and should be capped.
Mounting kit included to mount the gateway to the structure.

ppts

by vince

0
0 uses