Ground Control Point Operations
Complete Workflow for Survey-Grade GNSS Control Network Establishment
1
Site Reconnaissance
Planning & Assessment
Desktop Study
Review maps, imagery, existing data
Site Selection
Identify optimal GCP locations
Access Assessment
Evaluate accessibility & safety
Sky Visibility
Check GNSS signal obstructions
1-2 Days
Key Outputs:
Site maps, access plans, risk assessment, equipment checklist
2
GCP Marking
Physical Installation
Monument Installation
Permanent markers (concrete/brass)
Target Placement
Visible targets for surveys
Point Numbering
Unique IDs and documentation
Site Photography
Document each point location
2-3 Days
Key Outputs:
Installed monuments, point register, photographs, sketches
3
GNSS Observation
Precise Positioning
Equipment Setup
Deploy GNSS receivers on points
Static Observation
2-8 hour sessions per point
Network Geometry
Ensure proper baseline config
Quality Monitoring
Check satellites & data quality
3-5 Days
Key Outputs:
GNSS data files, observation logs, antenna records, metadata
4
Data Processing
Coordinate Computation
Data Import
Load RINEX files to software
Baseline Processing
Compute differential vectors
Network Adjustment
Least squares & error analysis
Quality Assessment
Validate accuracy & precision
1-2 Days
Key Outputs:
Adjusted coordinates, processing reports, quality statistics
5
Data Delivery
Final Documentation
Coordinate Compilation
Format in required datum
Report Preparation
Comprehensive survey report
Quality Documentation
Accuracy statements & metadata
Client Handover
Deliver all documentation
1 Day
Key Outputs:
Coordinate schedule, survey report, certificates, digital files