Livoa LogoLivoa
From - To


Hrs Code

Phase Code

Activity Non-Productive Code

NPT

Rig Status

MD from (m)

Operation

19:45 - 20:00


0.25

COM

TRS


STDBY

3005.00

- Ensure packer element is in good condition and verify correct number of pins are installed: Setting Sleeve (8ea) + Lower Slips (9ea) + Upper Slips (9ea).
- 9½" X 6" Quantum Max Packer S/N: C24P-2432
Rig down and transfer down 3½" tubulars handling equipment from rig floor to cantilever deck. Clear rig floor from excess equipment.

20:00 - 21:00


1.00

COM

RCT

OPRN

OPRN

3005.00

Pick up and make up TOOLSERV TD Swivel assembly to Lower Completion BHA. Function check swivel by applying RH rotation to top of swivel sub at 5-15 RPM / 8 kft.lbs TQ - Good test.

21:00 - 0:00


3.00

COM

RCT

OPRN

OPRN

3005.00

Note:
- TOOLSERV TD Swivel allows rotation of drillstring above Lower Completion Assy.
Continue run in 6½" X 7" Lower Completion Assy with 9½" x 6" Quantum Packer on 5½" DP stands to 1777m MD.
Note:
- Drift first 10 stands of 5" DP with 2.875" drift.
- Max Tripping Speed: 1.5mins / stand (in 9½" Casing)
- Make up to TDS on 1st stand of 5½" DP. Break circulate at 5 BPM / 466 psi.
- Fill up string and break circulate with 12.3 ppg DIF every 15 stands run in.
Offline:
- Continue rig down of Duta Klasik Mud Cooler - disconnect hoses from sand trap and centrifugal pump.

Table

by Ed

0
0 uses