11.2 MW
DATACENTER
12 MW Total Capacity 93% Utilization 43% Grid Independence 1.2 PUE
SOLAR
GRID
SMR
UPS @ 95%
BATTERY
Peak demand period starting in 15 minutes
Generator fuel level at 78%
by ak