Livoa LogoLivoa
User Guide for the SPRINT Planning Tool
STAGE 1: INPUT AND PRE-PROCESSING
Define Network Topology


(Nodes and Physical Links)

Load Traffic Matrix


(Bitrate Demands)

Configure Parameters


(Link Capacity)

Selection of IPoWDM Interfaces
STAGE 2: ROUTING AND ZR MODULES DIMENSIONING (SPRINT engine)
Calculate Paths


(Fixed/Alternative Routing)

Blocking Probability Evaluation


(Recursive method)

Update Link Capacity and Cost


(Iterative Process)

Iterate until threshold compliance
STAGE 3: OUTPUT AND ANALYSIS
Final Dimensioned Network Design
Report Generation


(Link Utilization, Number of ZR+ Modules)

Analysis of Results and Optimization
END OF PLANNING PROCESS

SPRINT-R

by njarac

0
0 uses