Livoa LogoLivoa
Parameter UDCPR Clause Ref. Required (UDCPR 2024) Provided (Clover Acropolis) Status
Carpet Area – 2BHK, 3BHK Table 7-E (Pg 213) Living ≥10 sqm, Bedroom ≥9.5 sqm, Kitchen ≥5.5 sqm, Toilet ≥2.2 sqm Living 28.12 sqm, Master BR 16.42 sqm, Other BR 15–17.9 sqm, Kitchen 8.2 sqm, Toilet 3.6–3.96 sqm ✔ Exceeds
Room Sizes – Balcony & Terrace Sec. 7.6, Balcony width ≥1.2 m Balcony 6.93 sqm (~1.5 m wide), Terrace 20.4 sqm ✔ Exceeds
Staircase Width & Riser Sec. 9.6.1, Min width 1.2 m, Riser ≤150 mm 1.2 m wide, 150 mm riser ✔ Meets
Lift Provision Sec. 9.6.2, 1 lift/20 flats, 8-person 2 lifts/wing (8-person), 272 flats / 8 wings = 34 flats per wing ✔ Exceeds
Inter-building Spacing Table 5-E, H/2 rule (33 m → 16.5 m) 20–35 m spacing ✔ Exceeds
Access Road Width Sec. 9.2, Min. 9 m (fire tender) 12 m wide road with footpath ✔ Exceeds
Parking – 4-Wheeler Table 9-D (Pg 240), 1 per flat 382 provided (272 flats) ✔ Exceeds
Parking – 2-Wheeler Table 9-D, 2 per flat 272 + 12 visitor + 2 EV = 286 ✔ Meets
Visitor Parking (Cars) 5% of flats = 14 9 provided ✘ Short
Visitor Parking (2W) 5% of 2W = ~14 10 provided ✘ Slight Short
EV Charging Sec. 9.12.6, 1 per 20 slots 2 car + 2 bike chargers (~compliant for 400 slots) ✔ Meets (min)
Refuge Area Sec. 9.12.8, mandatory above 24 m (post-2016 NBC) None (built 2009, pre-rule) ✘ Legacy Gap
STP (Sewage Treatment Plant) Sec. 9.18, mandatory >200 flats Provided, recycled for landscaping & flushing ✔ Meets
Rainwater Harvesting Sec. 9.19, mandatory for sites >0.4 ha Provided, collected for flushing ✔ Meets
Solar Water Heating / PV Sec. 9.20, mandatory for high-rise Solar heaters, PV for lobby/lifts ✔ Meets

SAMI

by SAM

0
0 uses