Livoa LogoLivoa
Workflow Processes in Construction Design Phase
Architect Initiates Design


Creates initial architectural drawings

Includes floor plans, elevations, and preliminary specifications

Based on project requirements and Investor's vision

Architect Consults with Engineers


Shares initial design with Structural, HVAC, and Construction Pit Engineers

Structural Engineer


Reviews architectural drawings for structural integrity

Develops foundation design, load-bearing walls, and support systems

HVAC Engineer


Analyzes design for HVAC requirements

Develops HVAC plans and ductwork layout

Construction Pit Engineer


Evaluates site conditions for construction pit design

Designs excavation plans, shoring systems, and dewatering strategies

Engineers Develop Detailed Plans


Based on architectural design and expertise

Engineers Submit Plans to Project Coordinator


Detailed plans submission

Ensures consistency, coordination, and compliance

Project Coordinator Reviews and Consolidates Plans


Ensures consistency and compliance

Consolidates plans into comprehensive design package

Project Coordinator Submits to Investor


Submits design package for review and approval

Investor Reviews and Provides Feedback


Ensures alignment with vision, budget, and project goals

Provides feedback to Project Coordinator

Project Coordinator Relays Feedback to Architect
Architect Revises Design (if necessary)


Modifies floor plans, elevations, or specifications

Based on Investor's feedback

Architect Updates Engineers (if necessary)


Updates Engineers on design revisions

Impact on engineering plans

Engineers Revise Plans (if necessary)
Iterative Process


Steps 4-11 repeated until Investor approves

Ensures stakeholder alignment and final design requirements met

Final Design Approval


Investor approves final design package

Construction Design Phase completion

Basis for subsequent Construction Phase

Design Workflow

by miki

0
0 uses